Funtion
1.Casting machine after installation, first make
sure that all switches are in the off position, namely earth leakage
circuit breaker (main power switch), position switch should be under,
trans, down, Shun switch (stop switch anyway) should in the stop
position;
2.The casting machine power plug and insert 220v
power outlet, open leakage circuit (up position) Power light is bright;
3.According to the casting habits, rotation inverted switch to the
desired direction of rotation position.
4.The foot control, feet gradually force (manual levers evenly forward),
the strengthening or rod forward, working turntable begins to rotate,
with feet or rod to strengthen the force of propulsion, working
turntable speed gradually increases. Until the operating requirement.
Installation
The aircraft in the installation process must
ground level, temperature 40 degrees Celsius, the user must do according
to electrical safety standard single-phase three-wire plug. |