110V Manual Clamping Paint Shaker |
![]() |
Summarization |
Thank you very much for using our manual clamping paint shaker: this machine is automatically controlled by a new alarm time setter. When the machine reaches the set time, it will automatically stop. Due to good safety and functionality, the machine will automatically stop when the door is opened. |
Specifiction |
|
Use notice |
1) This machine is suitable to mix the non-volatile liquid not the food liquid. 2) This machine must connect to the earth, or will have the danger of shocked by electricity. 3) Only the special technique worker or the people trained can do the work of installation and operation and maintenance. 4) Suitable power: AC110V, 60Hz (Note: the product must be 60Hz, otherwise the fuse will burn) 5) Take care of the machine surface to avoid any damage; machine should put on the firm and level place. 6) Cut off the electricity before maintenance and check to avoid any unexpected start operation. 7) Mustn't leave any tools or sundries inside of the machine. 8) Should assure the function complete of the machine after the maintenance. 9) The installation environment should apply to the local environment (published by the authority department). Don't pile the paint can around the machine, mustn't store the tinder inside the machine. Should cut off the power and take out the paint can after work. 10) Should put a "MUSTN'T SMOKE" sign at the 5 meters place aside the machine, mustn't use the machine within the tindery and explosive environment. 11) Mustn't operate the machine without any paint can inside the machine. 12) Max mixing weight is 30KG. 13) If there is any expected voice, press the emergency bottom to stop the machine and restart the machine again after check and solve the malfunction. |
Main function |
1) Set mixing time.Suggest setting a maximum time of no more than 2 hours at a time. |
Installation and readjust |
(1) Basic requirement: Firm and level concrete ground. (2) Readjust the 4 legs of the machine to make it put on the level place. (3) Move the machine with suitable tool to avoid overturning the machine. |
Process and methods of using the machine |
1.First open the packaging, take the machine out and put it on the firm and level ground (if the ground is not level, readjust the 4 legs of machine to make sure it will work on a level place) A: Turn the hand wheel anticlockwise to raise the clamping board to the max height which is suitable for the big can. |
Matainence |
To assure the usual working, extend the use-life, play its economic value greatly, should do a good daily maintenance. Notice: 1)Only the repair man can knock down this machine 2)Should cleanup the leak paint after use to keep the working platform and pole clean. 3)Lubricate the pole, bearing, springs periodly, and the set the cycle according to your need. 4)Should not use the acid liquid to clean the floor. 5)Should wear the industrial protecting gloves and cut off the electricity before doing the maintenance and check. |
Product display |
|
Item Number:154001 |
You can make
order with no worry. |